Very Large US Banking Concern (City of London)

Scope of work
On going annual maintenance contract supporting approximately 70 networked Air Sampling Detector Panels. Contract includes twice yearly preventative maintenance visits.
Special factors
All maintenance had to be completed outside office hours.

Criminal Investigation and Anti Terrorist Organisation (Central London)

Scope of work
Installation of approximately 6 kilometres of ABS Firepipe and approximately 50 Air Sampling Detector Panels.
Special factors
Due to the high security status of this organisation all engineers attending the site had to have security clearance to the very highest levels. Additionally all work had to be completed outside office hours.

Large Shopping Centre (East Anglia)

Scope of work
Site survey, analysis and rectification of substandard and potentially non-compliant installation by a third party.
Special factors
The client required a near immediate response and continual on-site working once engineers arrived on site. The project required ACi to work very closely with the panel manufacturer to ensure maximum overall system performance.

Food Storage Facility in Peckham (South London)

Scope of work
Supply and installation of a single Air Sampling Panel and approximately 200m of ABS Firepipe.
Special factors
The sampling capillary was to be located in a refrigerated room at minus 20 degrees. Air had to be heated to remove moisture prior to arriving at the detector.

UK Logistics & Distribution Company  (Swindon, Wiltshire)

Scope of work
Supply and installation of approximately 7 kilometres of ABS Firepipe and approximately 50 Air Sampling Detection Panels.
Special factors
This was a major refurbishment of an operating distribution centre. Work was organised in three phases and required extremely tight time frames demanded by the distribution centre’s customer – a major high street retailer.